{"id":27905,"date":"2018-03-20T23:32:48","date_gmt":"2018-03-20T21:32:48","guid":{"rendered":"http:\/\/netzwerke-21.de\/?p=27905"},"modified":"2018-03-21T00:06:50","modified_gmt":"2018-03-20T22:06:50","slug":"stz-alte-bahnbruecke-weicht-tunnel","status":"publish","type":"post","link":"https:\/\/netzwerke-21.de\/?p=27905","title":{"rendered":"StZ: Alte Bahnbr\u00fccke weicht Tunnel \/ StN: Im Norden rollen bald die Laster"},"content":{"rendered":"<p><strong>StZ:<\/strong> <a title=\"\" href=\"https:\/\/www.stuttgarter-zeitung.de\/inhalt.stuttgart-21-alte-bahnbruecke-weicht-tunnel.3c84b424-e98e-4e69-b4c2-1f072006e41d.html\" target=\"_blank\" rel=\"noopener noreferrer\">Alte Bahnbr\u00fccke weicht Tunnel<\/a>: <em>&#8222;Die Bahn rei\u00dft Teile der Logistikstra\u00dfe f\u00fcr Stuttgart 21 ab und schickt Lastwagen auf \u00f6ffentliche Stra\u00dfen. Im Rathaus geht man davon aus, dass das zu keinen Behinderungen f\u00fchrt. Der Bau der neuen S-Bahnstrecke ist im Zeitplan. Erste Z\u00fcge k\u00f6nnten noch vor Inbetriebnahme des Bahnknotens rollen.&#8220;<\/em><\/p>\n<p><strong>StN:<\/strong><a title=\"\" href=\"https:\/\/www.stuttgarter-nachrichten.de\/inhalt.s-bahn-tunnel-im-norden-rollen-bald-die-laster.5f74c4aa-10eb-4485-8234-3586cf4a92a7.html\" target=\"_blank\" rel=\"noopener noreferrer\"> Im Norden rollen bald die Laster<\/a>: &#8222;<em>Wegen des Baus eines Tunnels muss bis Mitte 2019 der Aushub von S\u200921 teilweise auf \u00f6ffentliche Stra\u00dfen abgefahren werden. Verkehrsprobleme soll es aber keine geben.&#8220;<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>StZ: Alte Bahnbr\u00fccke weicht Tunnel: &#8222;Die Bahn rei\u00dft Teile der Logistikstra\u00dfe f\u00fcr Stuttgart 21 ab und schickt Lastwagen auf \u00f6ffentliche Stra\u00dfen. Im Rathaus geht man davon aus, dass das zu keinen Behinderungen f\u00fchrt. Der Bau der neuen S-Bahnstrecke ist im &hellip; <a href=\"https:\/\/netzwerke-21.de\/?p=27905\">Weiterlesen <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8,41,43,80,24,53],"tags":[],"class_list":["post-27905","post","type-post","status-publish","format-standard","hentry","category-bauarbeiten","category-baulogistik","category-nordbahnhofviertel","category-s-bahn","category-verkehr","category-zeitplan"],"_links":{"self":[{"href":"https:\/\/netzwerke-21.de\/index.php?rest_route=\/wp\/v2\/posts\/27905","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/netzwerke-21.de\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/netzwerke-21.de\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/netzwerke-21.de\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/netzwerke-21.de\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=27905"}],"version-history":[{"count":3,"href":"https:\/\/netzwerke-21.de\/index.php?rest_route=\/wp\/v2\/posts\/27905\/revisions"}],"predecessor-version":[{"id":27908,"href":"https:\/\/netzwerke-21.de\/index.php?rest_route=\/wp\/v2\/posts\/27905\/revisions\/27908"}],"wp:attachment":[{"href":"https:\/\/netzwerke-21.de\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=27905"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/netzwerke-21.de\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=27905"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/netzwerke-21.de\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=27905"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}